期刊文献+

带优先加工约束2×n型异序排序的简便解法

Simple Solution for 2×n Job-shop Problems with Preference Sequence Restraint
在线阅读 下载PDF
导出
摘要 为解决异序排序问题,提出了新的表上作业法。该方法不仅可以解决2×n型异序排序问题,还可以有效地解决带优先加工约束2×n型异序排序问题。该方法简便易行,便于掌握,可获得比较满意的近似最优加工顺序。 A new table method is created to solve job-shop problems, which can effectively solve 2 × n job-shop problems as well as 2 × n job-shop problems with preference sequence restraint. The method is simple and easy to master, by which a comparatively satisfactory solution to scheduling with approximative optimization can be obtained.
出处 《东北林业大学学报》 CAS CSCD 北大核心 2006年第2期117-119,共3页 Journal of Northeast Forestry University
关键词 异序排序 智能优化算法 表上作业法 排序规则 优先加工约柬 Job-shop problems Intelligent optimization algorithms Table method Scheduling rules Preference sequence restraint
  • 相关文献

参考文献13

  • 1Ben-Daya M,AL-Fawzan M.A tabu search approach for the flow shop scheduling problem[J].Eueopean Journal of Operational Research,1998,109:88-95.
  • 2Dell'Amico M,Trubian M.Applying tabu search to the job shop scheduling problem[J].Ann Ops Res,1993,41:231 -252.
  • 3Jeong I K,Lee J J.Adaptive simulated annealing genetic algorithm for control application[J].Int J of Systems Science,1996,27 (2):241 -253.
  • 4Croce F D,Tadei R,Volta G.A genetic algorithm for the job shop problem[J].Computers & Operations Research,1995,22 (1):15-24.
  • 5Garey M R,Johnson D S,Sethi R.The complexity of flowshop and jobshop scheduling[J].Math Oper Res,1976,1:117 -129.
  • 6Michael Pinedo.Scheduling-theory,algorithms,and systems[M].New jersey:Prentice hall,Englewood cliffs,1995:1-186.
  • 7毛宁,刘霞,林洁瑜.关于M类机器的非流水复杂作业排序问题的一种启发式算法[J].工程数学学报,1996,13(2):65-73. 被引量:19
  • 8张明德.“非流水型n×m排序问题”简便方法的改进[J].广州市经济管理干部学院学报,1999,1(1):79-86. 被引量:1
  • 9牟小俐.mxn/RND排序选优及优化目标计算的实用方法图表排序法[J].管理现代化,1993,13(2):32-35. 被引量:1
  • 10Carlier J,Pinson E.An algorithm for solving the job-shop problem[J].Mgmt Sci,1989,35:164-176.

二级参考文献8

  • 1汤和,袁俊良.计算机辅助作业计划的启发式方法及其应用[J].天津大学学报,1994,27(4):454-459. 被引量:5
  • 2陈志龙,高校应用数学学报,1994年,9卷,2期,211页
  • 3陈志龙,数学的实践与认识,1994年,3卷,37页
  • 4张毕西,广东机械学院学报,1991年,9卷,2期,97页
  • 5JOHNSON S M. Optimal two-and three-stage production schedule with setup time included [ J ]. Naval Res Lo gist Quarter, 1954(1): 61 -68.
  • 6PALMER D S. Sequencing jobs through a multi-stage process in the minmum total time-a quick method of ob taining a near optimal [ J ]. Operation Research Quart, 1965(16): 101 -107.
  • 7GUPTA J N D. Heuristic algorithms for the exact solu tion of the three-machine scheduling problem. [ J] Management Science, 1972(16): 11 - 18.
  • 8黄婉珍,唐国春.分支定界法求解最小带权误工工件数排序[J].应用数学学报,1992,15(2):194-199. 被引量:11

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部