在全面测量温州发电厂三期工程主厂房桩基工程观测桩桩位的基础上,对几个典型桩位的桩体水平位移进行的统计分析表明,采用监测观测桩、调节沉桩速率和施工流水等措施能保证工程桩的水平偏移在可控制范围内。设置观测桩对预应力混凝土管桩在软土地基施工中具有指导意义。
Based on the full survey over the locations of the observation piles in the main plant pile foundation of Wenzhou Power Plant Phase III Project, a statistic analysis was made on the horizontal displacements of the typical piles, which indicated that by using observation piles, adjusting the settlement rate of pile and construction flow, the horizontal displacements of the engineering piles could be ensured to be within the controllable scope, Arranging observation pile has instructive significance to the construction of prestressed concrete pipe pile in soft soil foundation.
出处
《建筑技术》
北大核心
2006年第3期214-215,共2页
Architecture Technology
关键词
观测桩
位移
沉桩速率
observation pile
displacement
pile settlement rate