摘要
介绍了将高碑店污水厂的二沉池出水经过石灰法处理后用作华能北京热电厂循环冷却水的试验情况,分析了不同石灰投量对冷却水主要水质参数的影响。试验结果表明,经过石灰法处理的二沉池出水可以满足热电厂循环冷却水的水质要求。
Experiment was made on the use of lime process to treat the effluent from secondary sedimentation tank of Gaobeidian Wastewater Treatment Plant. The treated effluent was used as the recirculating cooling water in Huaneng Beijing Thermal Power Plant. The influence of different lime dosage on the cooling water quality parameters was analyzed. The result shows that the effluent from secondary sedimentation tank after treatment by lime process can meet the requirement for recirculating cooling water quality in the thermal power plant.
出处
《中国给水排水》
CAS
CSCD
北大核心
2006年第6期80-83,共4页
China Water & Wastewater
关键词
污水再生回用
石灰法
循环冷却水
石灰投量
wastewater reclamation and reuse
lime process
recirculating cooling water
lime dosage