摘要
四川省资阳市二水厂的源水是水库水,因藻类增多使原处理工艺无法正常运行,为此在尽量保留原有构筑物的基础上,采用气浮除藻工艺进行了改、扩建。介绍了气浮除藻工艺的设计方法,并在总结与分析运行效果的基础上,提出了改进工艺设计的新思路。
Algae are getting increased in reservoir water flowing to Ziyang No. 2 Waterworks in Sichuan Province, and the original treatment process fails to operate normally. Therefore, under the condition of reserving the original structures as possible, the waterworks is expanded and reconstructed by using air-flotation process for algae removal. The design method of air-flotation process for algae removal is introduced, and the new idea on the modified process design is put forward after making summarization and analysis of operating efficiency.
出处
《中国给水排水》
CAS
CSCD
北大核心
2006年第6期38-41,共4页
China Water & Wastewater
关键词
给水处理
气浮
除藻工艺
water treatment
air-flotation
algae removal process