期刊文献+

一类有动态时间窗的并行多机启发式调度算法 被引量:1

A Heuristic Scheduling Algorithm for Parallel Machines Job Sorting with Dynamic Time Window
在线阅读 下载PDF
导出
摘要 航班过站服务中的货邮装卸作业调度是一类有时间窗和作业调整时间的多目标多设备并行作业动态排序问题,其特点是作业时间窗和服务作业时间动态变化。在分析区别于一般制造业生产作业排序特点的基础上,建立了服务作业的调度模型,提出了设备能力差的概念,给出一个考虑不同设备加工能力的启发式分配法。当时间窗或服务时间发生变化时,算法只需要修改判断矩阵中的一行或一列数据,而对算法运行的效率没有影响。算例分析显示,能力差分配算法在减少航班延误数量、时间及设备生产能力平衡上均优于目前使用的先到先服务和最小负荷调度的混合算法。 Cargo & parcel loading and unloading in flight turnaround ground service is a multi-object parallel machines job sorting problem with time window and job shift time, its time window often be changed due to various reasons, machines service time is uncertain. Based on the analysis of features different form general manufacturing job sorting problems, a scheduling model of service is built, a new concept of Machine Capacity Difference is brought forward, a heuristic algorithm considered machine's ability difference is developed. It only needs to update one line or one row of data in judge matrix when time window or service time is changed while it doesn't impact executive efficiency of algorithm. Example shows that the algorithm is better than existed first-come-first-service and minimal remained workload ,scheduling combined algorithm, not only in reducing number of delay flights and delay time but also in balancing machines produce ability.
出处 《系统工程》 CSCD 北大核心 2006年第1期116-121,共6页 Systems Engineering
关键词 启发式算法 调度 时间窗 航班过站地面服务 Heuristic Algorithm Scheduling Time Window Flight Turnaround Ground Service
  • 相关文献

参考文献12

二级参考文献64

  • 1蔡延光,钱积新,孙优贤.智能运输调度系统的设计与实现[J].决策与决策支持系统,1996(4):108-114. 被引量:11
  • 2沈绍基.中国物流市场供求状况分析报告[J].物流科技,2000,23(2):3-14. 被引量:27
  • 3Gosling G D. Design of an expert system for aircraft gate assignment[J]. Transportation Research A,1990,24(1):59~69.
  • 4Su Y Y,Srihari K. A knowledge-based aircraft-gate assignment advisor[J]. Computers and Industrial Engineering, 1993, 25(2):123~126.
  • 5Babic O, Teodorovic D, Tosic V. Aircraft stand assignment to minimize walking[J]. Journal of Transportation Engineering,1984,110(1):55~66.
  • 6Bihr R A. A conceptual solution to the aircraft gate assignment problem using 0-1 linear programming[J]. Computers and industry Engineering, 1990,19(3):280~284.
  • 7Bolat A.Procedures for providing robust gate assign- ments for arriving aircrafts [J]. European Journal of Operational Research, 2000,120(1):63~80.
  • 8Arkin E M, Silverberg E B. Scheduling jobs with fixed start and end times[J]. Discrete Applied Mathematics, 1987,18:1~8.
  • 9Gupta U I, Lee D T. Leung J Y T. An optimal solution for the channel-assignment problem[J]. IEEE Transactions Computer, 1979, C-28:807~810.
  • 10Fischettim, Martello M S, Toth P. Approximation algorithms for fixed job schedule problems[J]. Operational Research, 1992,40:96~108.

共引文献310

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部