期刊文献+

大跨径钢管混凝土拱桥施工方法的风洞试验研究 被引量:5

Study of Wind-resistant of Integral Lifting Construction for Big Solid in Long-span Concrete-filled Steel Tube Arch Bridge
在线阅读 下载PDF
导出
摘要 钢管混凝土拱桥桥型美观、技术相对成熟,然而该类桥梁构件种类较多,施工复杂。为加快施工进度,增加快件的起吊重量不失为有效方法,但大块件吊装会带来稳定、塔架的安全等问题,其中塔架的抗风安全尤为重要。以南昌生米大桥主拱吊装为背景,研究了塔架及裸拱施工期间的抗风安全,并进行了风洞试验,得出了相关结论。 The steel pipe concrete arched bridge is gradually popular in China because of its type and mature technique. However, there are many categories of structural members in this bridge and construction is complex, so increasing the lift weight of the members to accelerate the construction progress is an effective method. But slinging the big members will bring about many problems such as stability, safety of pylon, especially the wind resisting safety. Regarding slinging of the main arch of Manchang Shengmi Bridge as the background, this paper discusses the wind resisting safety in construction period of pylon and barering, and does the wind tunnel tests.
出处 《筑路机械与施工机械化》 北大核心 2006年第3期41-43,共3页 Road Machinery & Construction Mechanization
关键词 钢管混凝土 龙门架 动力特性 风洞试验 涡激共振 steel pipe concrete giant gantries dynamic model wind tunnel test vortex inspiriting vibration
  • 相关文献

参考文献3

共引文献87

同被引文献72

引证文献5

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部