移动支架造桥机施工技术在森坑大桥中的应用 被引量:6

Application of Movable-supported Bridge-building Equipment Construction Technology in Senkeng Bridge
在线阅读 下载PDF
导出
摘要 通过移动支架造桥机施工技术在森坑一号大桥(5×56m箱梁)施工中的研究和应用,详细介绍了移动支架造桥机施工的过程及技术控制要点。施工现场结果表明,该技术适合于中等跨度简支箱梁的施工,且技术先进、安全可靠,具有较大的推广和应用价值。 The construction technology of the movable-supported bridge-building equipment was studied and applied on the construction of Senkeng No. 1 large bridge(5×56 m box beam). The construction process and the control technical points about the movable-support bridge-building equipment are introduced. It is found that this technique is not only safe and advanced but also adapt to the middle span box beam construction, which has a good application foreground and popularized value.
作者 罗方
机构地区 中铁一局五公司
出处 《筑路机械与施工机械化》 北大核心 2006年第3期38-40,49,共4页 Road Machinery & Construction Mechanization
关键词 桥梁工程 造桥机 拼装 箱梁 施工 bridge engineering bridge-building equipment assembling box beam construction
  • 相关文献

参考文献4

二级参考文献3

共引文献32

同被引文献14

引证文献6

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部