摘要
建筑在岩溶区近40年的大型建筑,由于岩溶发育,逐步形成土洞,进而发生地基塌陷,并造成墙体开裂,使用托板法进行地基处理,至今已逾2年,未再发生新的沉降塌陷。
Great buildings built for about 40 years in the karst region gradually formed soil caves and caused foundation collapse and crack of the wall body as a result of well-developed karst. Making foundation processing by using the plate stock method went through over two years. New settlement collapse has not arisen.
出处
《桂林工学院学报》
1996年第1期41-44,共4页
Journal of Guilin University of Technology
关键词
岩溶
塌陷
地基
托板法
基础沉降
karst, collapse, foundation, plate stock method, regulation