期刊文献+

斜靠式系杆拱桥钢主梁安装技术

Installation Technology for Main Steel Girders of the Inclined Tied-arch Bridge
在线阅读 下载PDF
导出
摘要 义乌丹溪大桥为国内首座斜靠式系杆拱桥,为确保桥梁各构件在成桥后能满足设计时的受力状态,并考虑安装施工的方便性和经济性,选用了标准器拖拉法进行钢主梁安装。详细介绍了膺架的设计、施工情况及利用移位器进行拖拉的安装技术;提出了几点技术保证措施。 The Yiwu Danxi Bridge is the first inclined tied-arch bridge in China. Standard dragging was applied in installation of the main steel girders so that all structural members of the completed bridge were able to follow the designed stress requirements and construction installation was convenient and economic. Design and installation of the falsework and the shifter-dragging technique and the technical guarantee measures are introduced in detail in the paper.
作者 孔文亚
出处 《铁道建筑技术》 2006年第1期19-21,共3页 Railway Construction Technology
关键词 斜靠式系杆拱桥 钢主梁 移位器 inclined tied-arch bridge main steel girder shifter installation
  • 相关文献

参考文献3

  • 1黄棠,周其刚.结构设计原理.北京:中国铁道出版社,1986
  • 2孙训方 方孝淑.材料力学[M].北京:人民教育出版社,1985.80~120.
  • 3TB 10212-98 铁路钢桥制造规范

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部