摘要
本文阐述了葛上直流输电工程两端交流系统对换流站无功功率调节的技术要求,分析了该工程无功功率调节的机理、实现方法及模拟试验结果,并对其控制性能作出了评价,指出了原设计中存在的问题,并提出了改进措施。
The reactive power control requirements for both converter stations of the Gezhouba-Shanghai HVDC transmisson project are described in this paper. The control principle and methods, the results of simulator study are discussed. The control performance, the defects in VC software and the improvements which should be taken are also discussed.
出处
《电网技术》
EI
CSCD
北大核心
1989年第3期40-46,共7页
Power System Technology