摘要
文章论述了位于湖南省岳阳市平江县境内的黄金洞金矿在选矿改造过程中,应用网络规划的理论,对关键工艺(磨矿)进行优化,在不增加磨矿设备的前提下,提高磨矿处理能力60t/d,选矿网络最大流由190t/d扩大至250t/d,并对选矿改造前后的经济效果进行了分析,同时,提出了进一步改进优化的方向。
The paper discusses that the network planning is applied to optimize key technology (ore grinding) in the reworking process of ore dressing plant in Huangjindong Gold Mine, which raise 60t/d amount of ore grinding and network maximum flow of ore dressing from 190t/d to 250t/d. The paper analyses economic benefit between before and after ore dressing transformation and puts foreword the optimize direction.
出处
《企业技术开发》
2006年第3期39-41,共3页
Technological Development of Enterprise
关键词
网络规划
选厂改造
工艺优化
效益评价
network planning
ore dressing plant transformation
technology optimization
benefit evaluation