摘要
文章介绍了石马铺大桥40mT梁预制施工质量控制要点。
The article has introduced the point of quality control about the prefabricated construction quality control of Shimapu bridge 40 meters beams.
出处
《企业技术开发》
2006年第3期8-9,54,共3页
Technological Development of Enterprise
关键词
石马铺大桥
40
mT梁
施工质量
控制
Shimapu bridge
40 meters beams
construction quality
control