摘要
介绍大体积混凝土转换梁冬期施工时为防止温度裂缝而采取的工程技术措施。现场实施效果表明,该技术措施可行且效果良好。
This article introduces the engineering measure taken against the temperature cracks of the mass concrete changeover beam when constructing in the winter. The onsite results demonstrate that this measure is feasible and satisfactory.
出处
《水利与建筑工程学报》
2006年第1期48-50,共3页
Journal of Water Resources and Architectural Engineering
关键词
转换梁
大体积混凝土
温度裂缝
控制
changeover beam
mass concrete
temperature crack
control