全站仪在杭州湾跨海大桥箱梁桩基定位中的应用 被引量:14

Application of Total Station Instrument in Location of Pill Foundation of Hangzhou Bay Major Bridge
在线阅读 下载PDF
导出
摘要 杭州湾跨海大桥位于杭州湾中部,是目前世界第一跨海长桥。本文介绍了杭州湾跨海大桥控制测量技术,讨论了在近海区利用全站仪对常规打桩船打桩的测量技术和在离海岸较远时利用GPS打桩系统打桩的方法。实践表明,该测量技术对海上架桥打桩工作具有一定的理论和实践指导意义。 Hangzhou Major Bridge is located in the middle of Hangzhou Bay, it is the longest major bridge over the sea. In the paper, the surveying technique of the bridge is introduced, the application of total station instrument in piling of Hangzhou Bay Major Bridge is discussed. It is pointed that the total station instrument is one of the choices to locate the piles as piling near the seaside, but GPS system is the best choice when piling in the long distance from the seaside.
出处 《水利与建筑工程学报》 2006年第1期24-26,共3页 Journal of Water Resources and Architectural Engineering
关键词 工程测量 箱梁施工测量 桩基施工测量 跨海大桥 engineering survey construction survey of box beam construction survey of pile foundation major bridge over the sea
  • 相关文献

参考文献4

二级参考文献5

共引文献42

同被引文献32

引证文献14

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部