连续梁桥跨河施工支架研究 被引量:13

Research of Falsework Erected over River for Construction of Continuous Girder Bridge
在线阅读 下载PDF
导出
摘要 主要研究了采用装配式公路钢桥桁架(通常称为贝雷架)做为支架进行连续梁桥现浇箱梁混凝土的施工方法;研究了跨河施工支架的技术方案,特别是施工支架在桥墩上的刚性斜撑,同时结合现场试验研究了施工支架的分析计算方法及变形。研究表明,采用装配式公路钢桥桁架解决跨河预应力混凝土连续梁现浇混凝土施工支架问题是有效的。 This paper mainly makes the research of construction method for cast-in-situ concrete box girder of continuous girder bridge, using assembled highway bridge steel truss (often known as Bailey Truss) as the falsework, technical schemes for the falsework erected over river, particularly the rigid slant supports of the falsework on piers, and analysis, calculation methods and deformation of the falsework in accordance with the related tests in field. The results of the research indicate that the assembled highway bridge steel truss is an effective means to resolve the common problems of falsework over river for construction of cast-in-situ prestressed concrete continuous girders.
出处 《桥梁建设》 EI CSCD 北大核心 2006年第1期39-41,61,共4页 Bridge Construction
关键词 施工支架 连续梁 桥梁施工 计算 分析 construction falsework continuous girder bridge construction calculation analysis
  • 相关文献

参考文献5

二级参考文献2

  • 1杜荣军,建筑施工脚手架实用手册,1994年
  • 2朱聘儒,钢-混凝土组合梁设计原理,1989年

共引文献50

同被引文献28

引证文献13

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部