摘要
分析了华东电网1995年52台200MW及以上火电机组的运行情况以及可靠性指标的完成情况。对影响可靠性指标的各种因素进行了分类比较,并对1995年发生的360次非计划停运的设备部件、技术原因、责任原因及全网一些共性的问题进行了认真总结和分析。对解决目前存在的主要问题以及进一步提高华东电网火电机组的可靠性指标提出了建议。
The operating performance and reliability of 52 thermal power generating units (200 MW and above) within ECPN in 1995 are analysed, and the equipments, technologieal cause, responsibility of staff and some common problems existed nationwide for 360 unplanned shut down of generating units in 1995 are summarized and analysed. Finally, recommendations for the resolution of currently existed problems and the further in provement in reliability of generating unit are suggested.
出处
《华东电力》
1996年第9期11-15,共5页
East China Electric Power
关键词
电网
火电机组
可靠性
华东地区
electric power networks fossilfired unit reliability analysis emergency shutdown