龙口水利枢纽工程设计过程中,充分考虑了各方面因素,合理利用地形和地质条件,解决了狭窄河道多建筑物枢纽总体布置、多泥沙河流排沙及大流量泄洪消能设施设计等问题,并经整体水工模型试验验证设计方案合理、切实可行。
During the course of designing Longkou Water Control Project, various factors are taken into considerations and the problems of arranging many structures on narrow river course, the sediment flushing in the river with so much sediment, the design of structures to discharge flood and dissipation are all solved and the design scheme is reasonable and feasible after it is verified by monolithic hydrostructure model test.
出处
《水利水电工程设计》
2006年第1期10-12,19,共4页
Design of Water Resources & Hydroelectric Engineering
关键词
龙口水利枢纽
总体布置
排沙
消能
模型试验