摘要
通过对PTA高压气送能力进行调试,在不进行资金投入(即不增加氮压机和不增大气送管径)的情况下,满足了装置扩容到180 t/d的需要。
By debugging of PTA high pressure gas transfer ability, under the condition of without capital investment, (without adding nitrogen compressor and without increasing the gas transfer pipe diameter), the demand of plant capacity increasing to 180 t/d was met.
出处
《聚酯工业》
CAS
2006年第1期35-36,62,共3页
Polyester Industry
关键词
PTA
气送能力
调试
PTA
gas transfer ablity
debugging