摘要
文章阐述了郑州市金水路立交桥基础桩工程施工中采用的主要技术装备、工艺、组织管理和施工中几个问题的处理措施。
This paper expounds the major technical equipments,technology organization management and the handling measures on some troubles of the engineering construction of the motorway interchange on Jinshui Road of Zhengzhou City.
出处
《河南地质》
1996年第2期125-131,共7页
Henan Geology
关键词
钻孔灌注桩
立交桥
郑州市
borehole grouting pile, motorway interchange, Zhengzhou City