摘要
分析了华东500 kV主环网短路电流水平.总结、归纳和分析了华东电网近年来应对短路容量超标矛盾的经验和措施.描述了2006~2007年华东电网控制和降低枢纽变电站短路电流水平的方案.
The short-circuit current level of the main 500 kV loop network of East China Power Grid is analyzed. Experience of managing the over-standard short-circuit current, as well as the countermeasures adopted by the Grid are summarized, and the scheme of controlling and reducing the short-circuit current for load-central substations in East China Power Grid during 2006 to 2007 are illuminated.
出处
《华东电力》
北大核心
2005年第12期29-31,共3页
East China Electric Power
关键词
华东电网
短路电流
限制措施
East China Power Grid
short-circuit current
eun'ent-limiting measure