摘要
简要回顾了泰和变电站220 kV G IS设备的LCC建模和计算结果,并核算了该工程的实际发生成本,对LCC计算进行了验证。验证结论表明,原先的LCC计算结果和工程实际成本相近,工程成本得到了很好的控制。
The LCC modeling and calculation on 220 kV GIS for Taihe Substation arc reviewed briefly, and the LCC calculation is evaluated based on the real cost occurred in the project, The results show that the LCC calculation value is close to the real cost of the project, and thus has put the cost in good control.
出处
《华东电力》
北大核心
2005年第12期15-19,共5页
East China Electric Power