期刊文献+

基于资金时间价值的工程投标报价优化模型及算法 被引量:3

Optimized Bid Model and Calculating Method of Project Biding Based on Time-value of the Capital
在线阅读 下载PDF
导出
摘要 根据工程量清单报价招标和工程款周期支付的特点,基于资金时间价值对工程承包收益的影响,利用不平衡报价原理和规划理论,提出了优化工程投标报价的线性规划模型和计算机算法,通过提高早期施工项目的单价,降低后期施工项目的单价,达到在保持静态投标总报价不变时提高工程承包收益的净现值,以提高实际收益水平;在保持收益现值不变时降低工程投标静态总报价,以提高中标率. Based on the effect of time - value of the capital on the profit of project contract and making use of the unbalanced method and programming theory, this paper constructs a model of optimizing the project bid. It proposes the optimized biding model as well as the computer calculating method of how to raise the actual contract profit while the total static bid keeps unchanged and how to decrease the total static bid and increase the rate of bid while the profit value keeps invariant, with specific cases, the paper illustrates the practicability and the operation in projects.
作者 朱立冬
出处 《郑州大学学报(工学版)》 CAS 2005年第4期110-112,共3页 Journal of Zhengzhou University(Engineering Science)
关键词 资金的时间价值 不平衡方法 规划理论 报价模型 time- value of the capital unbalanced method programming theory biding model
  • 相关文献

参考文献2

  • 1全国一级建造师执业资格考试用书编写委员会.建设工程经济[M].北京:中国建筑工业出版社,2004..
  • 2卢德林,章祥荪,马桂芝.土建工程报价优化模型[J].系统工程理论与实践,2002,22(9):47-53. 被引量:16

二级参考文献4

  • 1[1]Andrew Baldwin, Ronald McCaffer, Sherif Oteifa. International Bid Preparation[M]. Geneva: International Labour Office, 1992.
  • 2[2]Price A D F. International Project Accounting[M]. Geneva: International Labour Office, 1995
  • 3[3]Robert Gibbons. A Primer in Game Theory[M]. Princeton NJ: Princeton University Press, 1999.
  • 4[4]Paul R Milgrom, Robert J Weber. A theory of auctions and competitive bidding[J]. Econometrica, 1982,(5):1089-1122.

共引文献23

同被引文献15

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部