摘要
文章介绍在白河水库堤体工程施工中。
In this paper,The plan of stage diversion by contraction river bed in the construction of dam body of Balsa Reservior is introduced.
出处
《安徽水利水电职业技术学院学报》
2005年第4期36-38,共3页
Journal of Anhui Technical College of Water Resources and Hydroelectric Power
关键词
束窄河床
分期导游
截流
基坑排水
contraction river bed
stage diversion
closure
foundat ion pit draining