摘要
为了有效利用我国丰富的风能资源,促进我国风电建设的更快发展,国家发展和改革委员会办公厅决定从2003年开始用2年左右的时间,在全国范围内选择约20个10×10。kW以上的大型风电场,并完成风资源评价和提出风电场建设的可行性预研究报告,明确提出风能资源评价由气象部门承担。
In order to make effective use of our wind power resources and accelerate the development of wind power production, the national government decided to select twenty 10 × 10^4 kW or higher wind farms cross China and complete the wind resources assessment and the feasibility reports of wind farm construction within two years. The government also determined that the assessment should be conducted by the meteorological sector.