期刊文献+

华东电网抽水蓄能电站规划与展望 被引量:3

Plans and prospects of pumped-storage power stations in East China Power Grid
原文传递
导出
摘要 以华东电网系统运行成本最优为目标,阐述了华东电网抽水蓄能电站规划研究的最优建设规模。然后根据全网资源优化配置原则,针对华东电网具体情况,考虑电网输送能力和经济性等约束条件,给出了抽水蓄能电站在华东电网范围内的布局思路。在全面总结了近期华东电网抽水蓄能规划研究工作的基础上,对华东电网抽水蓄能建设进行了探讨和展望。 With the aim of achieving the lowest -system operation cost of the East China Power Grid. the optimal capacity of pumped-storage power stations in East China Power Grid is recommended. According to the principle of optimizing resources allocation throughout tile Grid and the actual situation of the Grid. the layout plans of pumped-storage power stations in East China Power Grid are given, with consideration of conditions such as network transmission rapacity and economy. Summarizing the planning study of pumped-storage power stations in East China Power Grid, the construction of pumped-storage power stations in the Grid is discussed and prospected.
出处 《华东电力》 北大核心 2005年第10期44-47,共4页 East China Electric Power
关键词 抽水蓄能 调峰规划 规模 布局 pumped-storage peak regulation plan size layout
  • 相关文献

参考文献4

二级参考文献5

共引文献29

同被引文献16

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部