摘要 杭州湾特大型桥梁首级GPS控制网历经三次测量,有必要对其三期结果进行综合分析。本文结合杭州湾大桥首级GPS控制网三期数据处理,从控制网的尺度、墓准、观测时间、基线解算、网平差等方面探讨了特大型桥梁控制网布设和数据处理方法,采用假设检验的方法对GPS控制网点位进行稳定性分析,给出了多期GPS网方差、协方差阵的提取方法。 Since Hang zhou gulf GPS network for super large bridge has been surveyed in different three times, it is necessary to analyze their data processed for further work. This paper discussed large bridge GPS network design and data processing, such as scale, datum, observation time, baselines processing and network adjustment etc. The hypothesis test method was used to analyze the stability of control points, and the mathematic model of hypothesis test for network exploited. Then the methods to yield variance covariance matrix from multi-session network were given. Finally, the involved problems for large bridge GPS network design data procession were put forward.
出处 《工程勘察》 CSCD 北大核心 2005年第5期51-54,64,共5页 Geotechnical Investigation & Surveying
关键词 GPS控制网 数据处理 假设检验 GPS network data processing hypothesis test
  • 相关文献

参考文献3

  • 1Hofmann-Wellenhof B, Lichtenegger H, Collins J. Global Position System Theory and Practice [ M ]. Fifth revised edition Springer, Wien New York 2001
  • 2杨一挺,景军郎.GPS技术在杭州湾跨海大桥首级控制网测量中的应用[J].东海海洋,2002,20(4):19-24. 被引量:6
  • 3Keliang Ding,Djie Liu,Congwei HU.Impacts of Correlation Baselines on the Adjustment of GPS Control Network [A]. 1st FIG International Symposium on Engineering Surveys for Constnlction Works and Structural Engineering Nottingham.United Kingdom,2004

二级参考文献4

  • 1GB/T18314—2001.全球定位系统(GPS)测量规范[S].[S].北京:中国标准出版社,2001..
  • 2中华人民共和国交通部.JTJ061—99公路勘测测量规范[S].1999.
  • 3中华人民共和国交通部.JTJ/T066—98公路全球定位系统(GPS)测量规范交通行业规范[S].1998.
  • 4浙江省第一测绘院.杭州湾交通通道工程首级平面和高程控制网测量专题报告,2001.