125MW机组大修后不点炉利用邻机抽汽中压缸冲转试验

ROTATIONIMPULSING TEST OF INTERMEDIATE PRESSURE CYLINDER BY USING EXTRACTION STEAM FROM NEIGHBOURING UNIT UNDER NONIGNITION CONDITION OF THE BOILER PROPER AFTER MAJOR REPAIR
在线阅读 下载PDF
导出
摘要 阐述采用单元制双直式锅炉的国产125MW汽轮发电机组进行大修后试验时,不点炉利用邻机抽汽实现中压缸冲转至定速,进而完成大修后机组带负荷前的全部试验及试并网。新的试验方案较传统方案可节约燃油160多t,节约生产成本60多万元。 For homemade 125 MW steam turbinegenerator set with double direct firing boilers of a unitized system, the rotationimpulsing of intermediate pressure cylinder and reaching a constant rotation speed had been realized in test after major repair by using extraction steam from neighbouring unit under nonignition condition of the boiler proper, and all tests and trial synchronization for parallel connection with the power network after major repair of the unit being further completed. Compared with traditional scheme, the new test scheme can save fuel oil of more than 160 t, saving production cost of more than 60000 yuan(RMB).
作者 马龙平
机构地区 秦华发电公司
出处 《热力发电》 CAS 北大核心 2005年第9期63-65,共3页 Thermal Power Generation
关键词 125MW机组 邻机抽汽 中压缸冲转 起动 节油 125 MW unit extraction steam from neighbouring unit rotationimpulsing of intermediate pressure cylinder startingup fueloil saving
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部