微山湖二线船闸基坑涌水量计算 被引量:2

Discharge Rate Calculation of Foundation Pit in Second Line Lock Gate in Weishanhu Lake
在线阅读 下载PDF
导出
摘要 以微山湖二线船闸基坑降水计算为例,把地表水发育地区、含水层和隔水层互层交错的水文地质条件,近似为无限均质含水层。基坑降水时基坑降水与均质含水层、设定降深、长期稳定开采时地下水资源计算雷同,理想大井法适用于基坑涌水量估算。 :Set foundation pit precipitation in second line lock gate in Weishanhu lake as an example, surface water developing area, hydrogeological condition of water-bearing and water-resisting layer interbedded are approximated to boundless homogeneous water-bearing layer. Calculation of foundation pit precipitation is approximate with homogeneous water-bearing layer, designed precipitation depth, and underground water amount under long-time stable mining. Ideal large-well mehtod is suitable for calculationg discharge rate of foundation pit.
出处 《山东国土资源》 2005年第9期58-60,64,共4页 Shandong Land and Resources
关键词 基坑降水 理想大井 涌水量 微山湖 Foundation pit precipitation ideal large well discharge rate Weishanhu lake
  • 相关文献

参考文献1

二级参考文献2

共引文献8

同被引文献9

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部