摘要
通过介绍引子渡水电站和芹山水电站在施工期设置的趾板区域反渗水处理系统,比较两个电站所采用不同反渗水处理系统之间的优劣,提出在堵超常规入坝水的基础上,以主动排水为主,可以较好地解决面板堆石坝在施工过程中因反渗水所带来的一系列工程问题,确保面板堆石坝安全和质量。
concrete-faced rockfill dam; counter-Seepage water; treatment methodology Abstract: This paper introduces the counter-seepage water treatment systems at the plinth areas placed during the construction of both Yinzidu and Qinshan hydroelectric projects, compares the advantage and disadvantage of the different counter-seepage treatment systems used in the said projects, outlines the methods of initiatively draining water in case of stopping up the exceptional regeneration water into the dam, and exposes the solutions to a series of problems caused by the counter-seepage water encountered during the construction of CFRD dam so that the safety and quality of CFRD dam are ensured.
出处
《水力发电》
北大核心
2005年第8期44-46,共3页
Water Power
关键词
面板堆石坝
反渗水
处理方法
concrete-faced rockfill dam counter-Seepage water treatment methodology