摘要
针对南山矿池填法筑坝速度慢,不能满足大规模生产的实际,进行了机械化筑坝实践,得出了控制好干滩面长度与库水位是实施机械筑坝的关键,取得了较好的经济效益。
In view of the slow tailings dam construction by pond filling in Nanshan Mine which couldn't meet the requirement of the practical large scale production, the mechanized dam construction was practiced. It was concluded that the control of the length of dried sands and the level of reservoir is the key in practicing mechanical dam construction. Good economic benefit was achieved.
出处
《金属矿山》
CAS
北大核心
2005年第9期29-31,共3页
Metal Mine