期刊文献+

航材过量消耗时间的灰色预测 被引量:2

The gray forecast about the excessive time consumption of air material
在线阅读 下载PDF
导出
摘要 针对在航材保障工作中经常遇到的过量消耗问题,将灰色预测的方法应用于航材过量消耗,并根据历史数据,建立了GM(1,1)预测模型,对航材过量消耗进行了灾变预测,并给出了以某场站某型液压泵每季度消耗总个数为原始数据的算例,模型检验证明此预测的可行性,根据GM(1,1)模型航材保障部门能够对可能出现的过量消耗器材进行提前筹措. As far as the material supply is concerned, excessive consumpfion is the most prominent problem that is encountered. In order to solve this problem, a GM (1,1) gray forecast model is introduced to predict the excessive air material consumption in this paper on basis of the historical data. The paper also presents a calculating example using the total consumption number of certains type of hydraulic pump per quarter at a field as the raw data. The model is proved to be feasible and useful for the Air Material Insurance Department to take measures to control the excessive air material consumption in advance.
作者 支乐 徐光耀
出处 《西安建筑科技大学学报(自然科学版)》 CSCD 北大核心 2005年第3期439-441,共3页 Journal of Xi'an University of Architecture & Technology(Natural Science Edition)
关键词 航材 过量消耗时间 GM(1 1)模型 灰色灾变预测 air materiel excessive consumption time GM (1,1) model calamities gray prediction
  • 相关文献

参考文献2

  • 1韩兴才 等.航材管理工程[M].蓝天出版社,2003..
  • 2薄承方.开展保障成本分析提高航材保障能力[J].徐州空军学院学报,:4-7.

共引文献1

同被引文献54

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部