摘要
结合生米大桥中横梁设计的特点和施工中遇到的技术难题,介绍在中横梁施工过程中,对中横梁预制、横移、装船以及运输等关键工序所采取的技术措施及解决技术难题的相应对策。
In the light of the design characteristics of middle cross beams for the Shengmi Bridge, and technical problems encountered in the construction of the beams, this paper illustrates the technical measures adopted for the critical working procedures of precasting, transverse sliding, loading on board ship and transportation of the beams in the construction, and corresponding solutions to the problems encountered therefrom.
出处
《世界桥梁》
北大核心
2005年第3期27-29,55,共4页
World Bridges
关键词
横梁
预制构件
桥梁施工
cross beam
precast element
bridge construction