摘要
本文针对预应力混凝土管桩施工中的超桩和短桩、斜桩、阻桩、挤土和振动影响等几个问题,分析其产生的原因,提出其防治的对策。
According to some problems of the prestress concrete pipe pile foundation in construction, such as exceed stake and short stake ,tilt stake, bar stake ,the influence of suqeeze soil and vibration, this article analyzes its reason, bring up its preventing and curing methods.
出处
《广州建筑》
2004年第1期34-37,共4页
GUANGZHOU ARCHITECTURE