摘要
本文结合某高层住宅小区结构方案设计,重点介绍了其中超长地下室及复杂转换层设计等技术难点及解决办法。
Using a high-rise residential project structural schematic design as a sample, the article discusses the extra long basement crack control, and complicate transfer floor design, also provides some solutions.
出处
《广州建筑》
2004年第3期5-7,共3页
GUANGZHOU ARCHITECTURE