期刊文献+

单机排序中带可分配工期的总误工问题的应急管理 被引量:4

Disruption management for single machine scheduling with assignable due dates to total tardiness
在线阅读 下载PDF
导出
摘要 对于机器排序的应急管理问题,QiXiang-tong等人进行了系统分析,得出了较好的结果.此文则考虑带可分配工期的总误工问题的应急管理问题.对于不同模型,或给出其最优序,或给出其近似解. Qi Xiangtong and Yu Gang studied disruption management for machine scheduling. Tbey obtained good results. This paper discussed disruption management for single machine scheduling with assignable due dates to total tardiness. For all these models,the optimal schedules or a near optimal schedules are given.
出处 《高校应用数学学报(A辑)》 CSCD 北大核心 2004年第B12期543-549,共7页 Applied Mathematics A Journal of Chinese Universities(Ser.A)
基金 国家自然科学基金(A0224017 A03240666 79928001 79870091)
关键词 单机 可分配工期 总误工 应急管理 single machine assignable due dates total tardiness disruption management
  • 相关文献

参考文献8

  • 1Schmidt G . Scheduling with limited machine availability [J]. European Journal of Operational Research, 2000,121 : 1-15.
  • 2Lee C Y,Liman S D. Single-machine flow-time scheduling with scheduled maintenance[J]. Acta Informatica, 1992,29: 375-382.
  • 3Clausen J,Hansen J ,Larsen J ,et al. Disruption management[J]. ORMS Today, 2001,28 : 40-43.
  • 4Thengvall B, Bard J F,Yu G. Balancing user preferences for aircraft schedule recovery during irregular operations [J]. IEEE Transactions on Operations Engineering, 2000,32 : 181-193.
  • 5Yu G, Yang J. Optimization applications in the airline industry, Handbook of Combinational Optimization[Z], 1998 ,Volume 2 ,Chapter 14,635-752.
  • 6Qi X,Bard J F,Yu G. Disruption management for machine scheduling[Z]. Working Paper,2002.
  • 7Qi Xiangtong, Yu Gang, Jonathan F. Bard,Single machine scheduling with assignable due dates[Z]. 2000.
  • 8Baker K R. Introduction to Sequencing and Scheduling[M]. New York :John Wiley & Sons, 1974.

同被引文献36

  • 1王颖,谢剑英.一种自适应蚁群算法及其仿真研究[J].系统仿真学报,2002,14(1):31-33. 被引量:232
  • 2杨丹,施金业,晏平.并行加工系统“提前/拖期”排序问题研究[J].重庆大学学报(自然科学版),1996,19(6):54-60. 被引量:2
  • 3All T U, Reha U, Ali S K. Rescheduling on a single machine with part-type dependent setup times and deadlines [ J ]. Annals of Operations Research, 1997, 70 : 93 - 113.
  • 4Yang J, Yu G. On the robust single machine scheduling problem [ J]. Journal of Combinatorial Optimization, 2002, 6( 1 ) :17 -33.
  • 5Yu G, Qi X T. Disruption management: framework, models and applications [ M ]. Singapore: World Scientific Publishing, 2004.
  • 6Qi x T, Bard J F, Yu G. Disruption management for machine scheduling: the case of SPT schedules [J]. International Journal of Production Economics, 2006, 103 ( 1 ) : 166 - 184.
  • 7Abumaizar R J, Svestka J A. Rescheduling job shops under random disruptions [ J]. International Journal of Production Research, 1997, 35 (7) : 2 065 - 2 082.
  • 8Yang J, Qi X, Yu G. Disruption management in production planning [J]. Naval Research Logistics, 2005, 52(5) : 420 - 442.
  • 9Wang J, Liu F, He P. Rescheduling under predictive disruption of WSPT schedule for single machine scheduling [ J]. ICIC Express Letter, 2010, 4(2) : 467 -472.
  • 10Zimmermann H J. Fuzzy set theory and its application[ M ]. London: Kluwer Academic Publishers, 2001.

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部