摘要
结合具体的工程概况,阐述了基坑土方开挖施工方法及施工工艺,对施工进度、机械计划以及相应的成品保护作了探讨,并依据具体的规范标准,强调了一些安全措施。
Combined with specific engineering, it illustrates construction method and process of earthwork digging in foundation pit, discusses construction schedule,mechanical plan and relative protection of finished product, security measures are emphasized according to specific standard.
出处
《山西建筑》
2005年第18期93-94,共2页
Shanxi Architecture
关键词
基坑
土方开挖
沉降
foundation pit, earthwork digging, sedimentation