分析了现有蒸汽和供电系统对茂名100万吨/年乙烯装置“安稳长满优”运行的影响,评价了新建CFB锅炉技改工程热电一体化的优势和经济效益。
The article analyzes the impact of the existing steam and electrical power system on Maoming(1 000kt/a) ethylene plant in terms of safe,stable,long time,full load and optimal operation.It also evaluates the(advantages) and economic benefits of the thermoelectricity integration of the newly built CFB boiler technical(renovation) project.
出处
《当代石油石化》
CAS
2005年第8期23-25,共3页
Petroleum & Petrochemical Today