溪洛渡水电站单机额定功率700 MW,最大功率770 MW,机组共18台(左右岸地下厂房各9台),水轮机最大水头230 m,水头变幅75 m。在设计工作中,合理选择水轮机参数对机组乃至电站的高效稳定运行至关重要。介绍了水轮机主要参数可行性研究阶段的设计成果。
At Xiluodu hydropower station , unit rated power is 700MW , maximum power is 770MW, 18 units are arranged in two underground powerhouses in left and right banks , each includes 9 units , maximum head is 230m with variation 75m . In design , it is very important to choose reasonable turbine parameters for units and even for effective and stable operation of the hydropower station. Design results of main turbine parameters in feasibility study stage are presented here .
出处
《四川水力发电》
2005年第4期52-58,共7页
Sichuan Hydropower
关键词
溪洛渡水电站
水轮机
比转速
比速系数
模型
原型
参数
Xiluodu hydropower station
turbine
specific speed
specific speed coefficient
model
prototype
parameter