我国电力工业发展规划问题 被引量:18

Problems of development planning for electric power industry in China
在线阅读 下载PDF
导出
摘要 在总结“十五”电力工业发展的基础上,提出了2006—2020年电力发展规划设想。共分5个部分:简要分析了“十五”电力工业发展中的10个主要问题;预测了2006—2020年发电量,2010年为3400TW·h,2020年5280TW·h;提出了电力工业发展战略,2010年全国需发电装机754GW,2020年约需1160GW;分析研究了水电、火电、核电、天然气发电、可再生能源发电的发展战略及发电量、发电装机容量构成;针对电网发展,概述我国六大区域电网,西电东送、特高压交直流输电及全国联网的发展情况;针对今后电力工业发展中的7个问题提出了建议。 On the basis of summing up electric power industry development in the “tenth-five year plan”, the idea of electric power development planning from 2006 to 2020 was presented. It is divided into 5 sections: analyzing simply 10 main problems of development planning in the “tenth-five year plan”; forecasting the electricity generation of electric power from 2006 to 2020, 3 400 TW- h in 2010 and 5280 TW- h in 2020; putting forward the development strategy of electric power in China, the generating capacity 754 GW in 2010 and 1160 GW in 2020 respectively; studying on the developing strategies of hydropower, thermal power, nuclear power, natural gas power and renewable power and the component of the electricity generation and the generating capacity; outlining the development situation of 6 big-regional power grids, “power transmission from western to eastern regions”, EHV AC/DC power transmission and national power grid interconnections, as well as presenting 7 suggestions about electric power development in the future.
机构地区 国家开发银行
出处 《中国电力》 CSCD 北大核心 2005年第9期11-14,共4页 Electric Power
关键词 电由工业 发展规划 装机容量 发电量 区域电网 electric power industry development planning generating capacity electricity generation regional power grids
  • 相关文献

参考文献1

  • 1中国电力年鉴编辑委员会.中国电力年鉴(2004)[M].北京:中国电力出版社,2005..

同被引文献152

引证文献18

二级引证文献204

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部