期刊文献+

采集再工程项目管理数据的“黑匣”解决方案 被引量:1

The "Black Box" Solution of Project Management Data Collection in Software Re-engineering
在线阅读 下载PDF
导出
摘要 针对数据采集难以保证数据的真实性和实时性问题,从今后软件工程主流趋势的软件再工程入手,提出了嵌入再工程开发支援系统的“黑匣”解决方案,通过记录程序内部变化,自动采集再工程项目管理数据.并介绍了一个应用实例,该实例已获得国家软件著作权,并在多个再工程项目中得到验证,取得了良好效果. It is difficult to guarantee the reliability and real-time ability of data. This article proposes a “Black Box” solution, based on software Re-engineering that is becoming the main tendency of software engineering. The solution is realized by embedding software Re-engineering into development supported system. Re-engineering project management data is collected by recording all changes of program inside automatically. The article introduces an instance using this solution, which has gotten the copyright of China, and been verified to be effective in some projects of Re-engineering.
出处 《北京工业大学学报》 CAS CSCD 北大核心 2005年第4期394-398,共5页 Journal of Beijing University of Technology
关键词 软件再工程 数据采集 软数据/硬数据 “黑匣”解决方案 software Re-engineering data collection; soft-data/hard-data; “Black Box” solution
  • 相关文献

参考文献5

  • 1JONES Capers. Applied Software Measurement: Assuring Productivity and Quality[M]. 2nd ed. New York: McGraw-Hill, 1996.
  • 2JALOTE Pankaj. CMMI in Practice: Processes for Executing Projects at INFORSYS[M]. Amsterdam: Addison-Wesley, 2002.
  • 3DUSTIN Elfriede, RASHKA Jeff, PAUL John. Automatic Software Testing: Introduction, Management, and Performance[M]. Deutschland: Addison-Wesley, 2002.
  • 4OHIRA Masao. Empirical Approach to Software Engineering[EB/OL]. http:∥www.empirical.jp, 2004-08-20/2004-09-10.
  • 5ZHAO Xiao-hua, HASHIMOTO Shigekazu, WNAG Zheng, et al. Project management data collection in pattern-oriented software Re-engineering[A]. Proceedings of the 2nd International Conference on Project Management [C]. Tokyo: SPM, 2004. 129.

同被引文献10

  • 1Daryl Kulak,Eamonn Guiney,Erin Lavkulich.Use Cases Requirements in Context[M].Second Edition,Addison-Wesley,2003
  • 2Ian Sommerville.Software Engineering[M].7th Edition,Addison-Wesley,2004
  • 3Roger S Pressman.Software Engineering:A Practitioner's Approach[M].Sixth Edition,McGraw-Hill,2004
  • 4Kent Beck.Extreme Programming explained:Embrace Change[M].Addison Wesley,2002
  • 5Xiaohua Zhao,Shigekazu Hashimoto,Zheng Wang et al.Project Management Data Collection in Pattern-Oriented Software Re-engineering[C].In:2004 Proceedings of the 2nd International Conference on Project Management (ProMAC2004),ISBN 4-902378 -03-5 C-2034,2004:129~136
  • 6Alan Shalloway,James R Trott.Design Patterns Explained:A New Perspective on Object-Oriented Design
  • 7Scott W Ambler.More Process Patterns--Delivering Large-Scale Systems Using Object Technology[M].Cambridge University Press,1999
  • 8Nenad Stankovic.Software Project Management:A Perspective[C].In:2004 Proceedings of the 2nd International Conference on Project Management (ProMAC2004),ISBN 4-902378-03-5 C-2034,2004:25 ~30
  • 9Brian A White.Software Configuration Management Strategies and Rational ClearCase[M].Addison-Wesley,2000
  • 10Scott W Ambler.More Process Patterns--Delivering Large-Scale Systems Using Object Technology[M].Cambridge University Press,1999

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部