摘要
本文结合实例提出了基坑工程施工过程中地表沉降预测的BP网络分析方法,建立和编制了在各种条件下均能类似地应用的预测网络模型和计算程序,取得了令人满意的结果。
This paper puts forward the BP network predicting method in excavation construction, established the predicting model which can apply to these similar conditions. The prediction results prove BP network is valid. (by Xia Honglang et al)
出处
《地质装备》
2005年第3期31-34,共4页
Equipment for Geotechnical Engineering