摘要
国中(秦皇岛)污水处理厂为BOT项目,处理规模为12×104m3/d,采用取消初沉池的A/O除磷工艺,介绍了主要设计参数及各单元控制过程,总结了系统对有机物及磷的处理效果,分析了影响A/O工艺生物除磷的主要因素。
InterChina (Qinhuangdao) Wastewater Treatment Plant was built and operated in BOT mode. It had treatment capacity of 12× 10^4 m^3/d, and adopted A/O process without primary clarifier for phosphorus removal. The main design parameters and control process of each unit were introduced and the efficiency of removal of organic matters and phosphorus was summarized. The key factors affecting the A/O process for phosphorus removal were analyzed.