期刊文献+

具有复杂拓扑结构明满流隧洞的水电站瞬变计算 被引量:4

Simulation of transient mixed free-surface-pressure flows for all kinds of tunnel network topologies in hydropower stations
原文传递
导出
摘要 为了研究尾水系统拓扑结构复杂的大型水电站尾水隧洞内可能出现的明满交替流动对电站水力瞬变过程的影响,采用特征隐式格式法计算明满交替流动,并根据该方法的特点建立了明满流特征隐格式矩阵方程自生成系统,实现了电站中各种布置方式尾水隧洞内明满交替流动的自适应计算。将该方法应用于电站的瞬变计算,分析了下游反射界面位置的设定对计算结果的影响,并得到了尾水隧洞中发生明满交替流动时出现最大压力的位置及相应的下游水位。 Transient mixed free-surface-pressure flows occur in tailrace tunnels of many hydropower stations with complex topological structures. The Characteristic Implicit Method was used to compute the mixed free-surface-pressure flow. The characteristic implicit scheme equation predicts the shape of the mixed free-surface-pressure flow for all kinds of tunnel network topologies. The program was used to successfally predict the tranient flow fields in hydropower stations, including the effect of downstream reflection interfaces and to calculate the position of the maximum pressure in the mixed free-surface-pressure flows in tailraces.
出处 《清华大学学报(自然科学版)》 EI CAS CSCD 北大核心 2005年第8期1126-1129,1133,共5页 Journal of Tsinghua University(Science and Technology)
关键词 水力机械 明满交替流动 特征隐式格式 仿真 自适应计算 hydraulic machinery mixed free-surface-pressure flow characteristic implicit method simulation self-adapting calculation
  • 相关文献

参考文献6

  • 1Chaudhry M H. Applied Hydraulic Transients [M]. CHEN Jiayuan, SHUN Shijie, ZHANG Zhibin. Chengdu: Sichuan Institute of Waterpower Engineering, 1985. (in Chinese).
  • 2Almeida A B, Koelle E. Fluid Transients in Pipe Networks [M]. Southampton: Computational Mechanics Publications, 1992.
  • 3Mahmood K, Yevievic V. Unsteady Flow in Open Channels [M]. LIN Bingnan. Beijing: Hydroelectric Press, 1987. (in Chinese).
  • 4李辉,陈乃祥,樊红刚,刘立宪,林宵汉.具有明满交替流动的三峡右岸地下电站的动态仿真[J].清华大学学报(自然科学版),1999,39(11):29-31. 被引量:20
  • 5清华大学水力学教研组编.水力学 [M].北京: 人民教育出版社,1982..
  • 6Wylie E B, Streeter V L, Suo Lisheng. Fluid Transients in System [M]. Englewood Cliffs, New Jersey: Prentice Hall Inc, 1993.

二级参考文献5

  • 1麦赫默德 林秉南译.明渠不恒定流[M].北京:水利电力出版社,1987..
  • 2刘立宪 李辉 等.大型输水或发电工程动态仿真中明流管流联合计算问题研究[M].全国水利水电水力机械信息网1997年会,1997,10..
  • 3Lin Xiaohan,XIXIAHR Sympo,1998年
  • 4刘立宪,全国水利水电水力机械信息网1997年会,1997年
  • 5麦赫默德,明渠不恒定流,1987年