主要介绍北京地铁5号线蒲黄榆车站施工过程中的监控量测技术,指出浅埋暗挖地铁施工要遵循新奥法原理,以量测信息指导设计和施工。
The technologies of monitoring and controlling survey in the construction of Puhuangyu Station of Beijing metro line 5 are introduced. The principle of New Austria Tunneling Method is still applicable to the shallow mining metro construction. The survey data can be used to guide the design and construction.
出处
《都市快轨交通》
2005年第4期121-125,共5页
Urban Rapid Rail Transit