摘要
介绍南京地铁试桩概况、自平衡试桩法的工作机理及其在南京地铁1号线一期工程中成功应用。试验结果可为设计单位提供依据。
The general situation of the pile foundation trial of Nanjing metro, the working principle of self-balancing pile trial method and its successful application in the first stage construction of Nanjing Metro Line 1 are introduced. The trial results can be used by the design.
出处
《都市快轨交通》
2005年第4期49-51,共3页
Urban Rapid Rail Transit