摘要
随着地铁的修建,地铁网络逐步形成,盾构技术在其中扮演着重要角色。对盾构地铁隧道引起地层变形和位移的主要因素、变形状况进行了分析,并阐述了相应采取的施工技术措施。
In recent years,as construction of subway constantly,subway network gradually formed,subway tunnel underneath the existing metro lines inevitable shield technology,in which played an extremely important role.This paper analyzed the cause of shield tunnel strata distortion and displacement of the main factors caused by deformation condition.A detailed analysis of construction technical measures should be taken.
出处
《机械管理开发》
2012年第1期108-108,110,共2页
Mechanical Management and Development
关键词
地铁隧道
盾构技术
施工技术
subway tunnel
shield technology
construction technology