摘要 本文总结了"5.12"汶川地震堰塞湖应急工程除险经验,介绍了堰塞湖应急除险的特点、原则、初期快速评估风险的方法,并综合有代表性的堰塞湖工程除险方案介绍了典型处置方法,以便为以后同类工程提供相关经验。 The experiences from the constructions of the emergency risk-eliminations of landslide dams formed during '5.12' Earthquake are summarized herein;in which not only the characteristics,principles,method for the early-stage quick risk assessment are introduced,but some typical construction methods are also presented based on the representative schemes for the risk-eliminations,so as to provide some relevant experiences for the similar project concerned in the days to come.
出处 《水利水电技术》 CSCD 北大核心 2012年第1期48-51,共4页 Water Resources and Hydropower Engineering
关键词 堰塞湖 风险评估 应急除险 施工组织 “5.12”汶川地震 landslide dam risk assessment emergency risk-elimination construction organization '5.12'Earthquake
  • 相关文献

参考文献2

二级参考文献12

共引文献34

同被引文献16

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部