期刊文献+

线性需求合并短缺的有限时间水平的生产──库存模型 被引量:8

The Production-Inventory Model for a Finite Time Horizon with Linear Trend in Demand and Shortages
原文传递
导出
摘要 本文研究了线性需求合并短缺的有限时间水平的生产—库存问题,在相继的周期长度以等差方式递减的条件下,给出了一种寻求是优周期数,最优调查时刻以及各周期的最优生产率的交替逼近方法.同时无短缺时的相应结果也被得到.并给出了应用实例. This paper deals with the production-inventory problem for a finite time-horizon with linear trend in demand and shortages, and presents an alternative approach for finding the optimal number of cycles;the opti-mal adjustment times and the optimal production rate for each cycle. The method is developed by assuming that succesive cycle lengths are in arith-metic progression. The corresponding results in the absence of shortage are also derived and finally some applided examples are given.
作者 周永务
出处 《系统工程理论与实践》 EI CSCD 北大核心 1995年第5期43-49,共7页 Systems Engineering-Theory & Practice
关键词 库存模型 线性需求 生产率 production inventory demand short age
  • 相关文献

同被引文献18

  • 1赵菊,周永务.带有线性趋势的单物品库存补充模型比较[J].合肥工业大学学报(自然科学版),2004,27(12):1579-1584. 被引量:3
  • 2周永务.带有时变需求和滞后支付的库存系统的最优经济批量模型[J].系统工程与电子技术,1997,19(6):40-44. 被引量:2
  • 3周永务,第一届智能控制与智能自动化学术年会论文集,1994年
  • 4Chung K H,Prod Plan Control,1994年,5期,392页
  • 5Zhou Yongwu,J Syst Sci Syst Eng,1997年,1期,103页
  • 6Zhou Yongwu,J Opl Res Soc,1996年,47卷,1175页
  • 7周永务,系统工程理论与实践,1995年,15卷,43页
  • 8Hong J,Computers Industrial Engineering,1990年,18卷,119页
  • 9Israeld,Moshe E O.How far should JIT vendor buyer relationship go[J].International of Production of Economics,2003,81-82:203 -215
  • 10Chao Hsien J,Yang J.As study of an integrated inventory with controllable lead time[J].International of Production Reasearch,2002,40 (5):1263-1273.

引证文献8

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部