摘要
本文详细地叙述了利用CSIMAN仿真系统的NQ(I)和NR(I)调整MR(I)以实现机床群的合理配置的方法.根据资源利用率和实体排队长度,选择加工车间机床群中的关键设备并确定机床群中各种机床台数的最佳配置方案.
This paper describes in detail the methods for regulating MR (I) to achieve rational dispusition of different machine tool's number in the interior of a machine tool group by use of NQ(I) and NR(I) in CSIMAN simulation system, the methods to select the cirtical installations from a machine tool group of machining workshop and determine a optimum plan for dispose number of different machine tools in the interior of a machine tool group by the light of the capacity utilization and the length for the queued entities.
出处
《系统工程》
CSCD
1995年第6期23-28,共6页
Systems Engineering