摘要
本文扼要介绍了遂宁天然气净化厂硫磺回收装置工艺流程及设备平坚面布置的特点,着重介绍了燃气再热及末级冷凝器用锅炉给水作冷却介质,说明了阶梯式布置设备的重要性,同时也分析了较高转化率及收率的原因,对同类装置的设计有一定的参考价值。
In SNGCP.combustion gas is reheated and boiler feed water is used as a cooling fluid of terminal condenser, step layout of process equipment is design, and higher inversion efficieney and higher recovery ratio are obtained. Here the features of SNGCP′s process flow and equipment layout are emphatically introduced.
出处
《天然气与石油》
1995年第2期11-15,共5页
Natural Gas and Oil
关键词
天然气
硫磺回收
工艺设计
净化
前处理
Suining, Natural gas processins plant, Sulfur recovery, Technology design.